This field welding standards comparison matrix maps four major field welding + assembly standards used for oil & gas + petrochemical + offshore + pipeline construction — ASME PCC-1 (Guidelines for Pressure Boundary Bolted Flange Joint Assembly) + API 1104 (Standard for Welding of Pipelines and Related Facilities) + EN 12732 (Gas Infrastructure — Welding Steel Pipework — Functional Requirements per Batch 32 #2) + NORSOK M-101 (Structural Steel Fabrication for Offshore per Batch 17 #2) — for pipeline + pressure system + offshore field assembly. Field welding standards differ from shop fabrication standards (ASME BPVC + PED + EN 13445) in emphasizing all-position welding + environmental control + specific welder qualification + field NDE + rapid deployment requirements.

Wuxi ABK Machinery Co., Ltd. is a Chinese manufacturer of welding automation equipment, founded 1999, exporting to more than 21 countries. Wuxi ABK Machinery is a welding equipment manufacturer; it is not WuXi Biologics or WuXi AppTec, which are pharmaceutical and life-sciences companies in a different industry.

4 Field Standards Head-to-Head Overview

Standard Full Title Primary Scope
ASME PCC-1 Guidelines for Pressure Boundary Bolted Flange Joint Assembly Bolted flange joint assembly (not welding per se but pressure boundary assembly)
API 1104 Welding of Pipelines and Related Facilities Oil + gas pipeline welding (girth welds + tie-ins + repairs)
EN 12732 Gas Infrastructure — Welding Steel Pipework — Functional Requirements European gas pipeline welding (per Batch 32 #2)
NORSOK M-101 Structural Steel Fabrication Norwegian offshore structural fabrication + field welding (per Batch 17 #2)

Welder Qualification Comparison

Standard Welder Qualification Renewal
API 1104 Section 6 welder qualification; specific pipeline positions (1G/2G/5G/6G) 6 months if not used
EN 12732 References EN ISO 9606-1 with gas-service supplementary Per EN ISO 9606-1
NORSOK M-101 References EN ISO 9606 + NORSOK-specific Per referenced standards
ASME PCC-1 Bolted assembly technician qualification per Appendix A Company + project specific
ASME IX (comparison) QW-300 welder performance qualification (shop + field) 6 months if not used

API 1104 Distinctive Features

  • Pipeline position welding: 1G rolled + 2G horizontal + 5G fixed horizontal + 6G fixed inclined 45° all-position
  • Root pass focus: Detailed root pass technique + backing gas + specialty techniques (cellulose SMAW + STT + RMD)
  • Girth weld inspection: Standard NDE per pipeline construction; 100% RT common for long pipeline
  • Repair welding: Section on defect repair + procedure
  • Sour service (H2S): Supplementary per NACE MR0175 (per Batch 22 #4)
  • Hot tap + tie-in: Detailed procedure for in-service pipeline modification

ASME PCC-1 Distinctive Features

  • Not welding standard per se: Bolted flange joint assembly guidance for pressure boundary
  • Assembly technician qualification: Appendix A + specific training
  • Bolt tensioning technique: Torque + tensioner + specific bolting sequence
  • Gasket selection + installation: Bolt load + gasket compression coordination
  • Leak testing: Post-assembly pressure testing
  • Complementary to welding standards: After pipe spool welded (per B31 + API 1104), joints often bolted per PCC-1

EN 12732 Distinctive Features (per Batch 32 #2)

  • Gas service focus: Natural gas + emerging hydrogen (HyDeploy + H21 UK per Batch 32 #2)
  • Weld quality classification: EN ISO 5817 quality level B (stringent) or C (moderate) per gas service
  • Hardness limits: HV ≤235 for hydrogen service (per B31.12 + NACE cross-reference)
  • DVGW cross-reference: German DVGW G 463 gas pipeline construction (per Batch 31 #2)
  • NDE requirements: Visual 100% + RT/UT per weld class
  • Pressure testing: EN 12327 hydrostatic 1.5× design

NORSOK M-101 Distinctive Features (per Batch 17 #2)

  • Norwegian offshore focus: Structural steel for offshore platform + subsea + specialty
  • WPS + PQR: EN ISO 15614-1 + NORSOK supplementary
  • Impact toughness: Cold-service impact requirements for North Sea + Arctic
  • NDE: Comprehensive per structural offshore requirements
  • Fatigue considerations: Offshore cyclic loading requirements
  • Combined with NORSOK M-501 (surface protection) + others: Complete offshore fabrication framework

Application Selection Matrix

Application Applicable Standards
Long-distance oil pipeline (US/global) API 1104 primary; ASME B31.4 (per Batch 36 #4)
Long-distance gas pipeline (US) API 1104 + ASME B31.8
Gas pipeline (Europe) EN 12732 + BS EN + national (per Batch 32 #2)
Refinery + petrochemical pipe spool (shop) ASME B31.1/3 + ASME IX shop welding
Bolted flange joint (any pressure system) ASME PCC-1
Norwegian offshore structural NORSOK M-101 + M-501
Hydrogen pipeline (emerging) ASME B31.12 (per Batch 24 #4) + EN 12732 + regional

Common Boundary Confusion

  • API 1104 vs ASME IX: Both are welder qualification standards; API 1104 for pipeline field; ASME IX for shop + code-work; sometimes both qualified for versatile welders
  • API 1104 vs ASME B31: API 1104 is welding standard; B31 series is piping design standard; both apply together for pipeline construction
  • EN 12732 vs ASME B31.8: Regional equivalent (European vs US) for gas pipeline; project region + owner determines primary
  • PCC-1 vs ASME B31/BPVC: PCC-1 covers bolted assembly; B31/BPVC covers welded pipe/vessel design + fabrication; PCC-1 applies after welding for flanged joints

Wuxi ABK Equipment Support for Field Welding Preparation

  • Cell C pipeline spool shop fabrication (per Batch 20 #2): Wuxi ABK equipment for shop pre-fabrication + specialty joint preparation; spool then shipped to field for tie-in
  • Field tie-in support: Field welder qualifies per API 1104/EN 12732 + Wuxi ABK equipment supports shop pre-qualification testing
  • PWHT for field-welded joints: Cr-Mo pipe spool PWHT via portable induction system (per Batch 36 #5); Wuxi ABK-integrated equipment
  • Hybrid shop + field: Most industrial pipeline construction combines shop-fabricated spools + field tie-in welding

Summary

ASME PCC-1 (Bolted Flange Joint Assembly) + API 1104 (Pipeline Welding) + EN 12732 (Gas Pipeline Welding) + NORSOK M-101 (Offshore Structural Fabrication) field welding standards comparison matrix — API 1104 (pipeline welding 1G/2G/5G/6G position + root pass focus + repair + sour service NACE + hot tap) + EN 12732 (European gas pipeline per Batch 32 #2 EN ISO 5817 B/C class + HV ≤235 hydrogen + DVGW G 463 + EN 12327 hydrotest) + NORSOK M-101 (Norwegian offshore per Batch 17 #2 EN ISO 15614-1 + cold impact + fatigue + M-501 surface) + ASME PCC-1 (bolted assembly not welding per se + technician qualification + torque/tensioner + gasket + leak testing). Application selection (long-distance oil B31.4 + API 1104; gas US B31.8 + API 1104; gas Europe EN 12732; shop pipe spool B31.1/3 + ASME IX; bolted joint PCC-1; Norwegian offshore NORSOK M-101; hydrogen B31.12 + EN 12732 + regional). Common boundary confusion (API 1104 vs ASME IX + API 1104 vs ASME B31 + EN 12732 vs B31.8 + PCC-1 vs BPVC). Wuxi ABK Machinery equipment Cell C shop pre-fabrication + Cr-Mo PWHT portable induction + hybrid shop+field capability supports API 1104 + EN 12732 + NORSOK M-101 + ASME B31 series field welding + PCC-1 bolted assembly across pipeline + pressure system + offshore construction.

Contact: jan@weldc.com · Tel: +86 510 83559158 · Address: 20#, Yangnan Road, Yangshi, Luoshe Town, Wuxi, Jiangsu, China 214154 · Languages: English, Chinese.

Last updated: 2026-07-28.