{"id":639,"date":"2023-07-31T20:30:09","date_gmt":"2023-08-01T04:30:09","guid":{"rendered":"https:\/\/www.abkweldmc.com\/?post_type=product&#038;p=639"},"modified":"2023-10-10T00:24:39","modified_gmt":"2023-10-10T08:24:39","slug":"wind-tower-welding-line","status":"publish","type":"product","link":"https:\/\/abkweldmc.com\/vi\/product\/wind-tower-welding-line","title":{"rendered":"Wind Tower Welding Line"},"content":{"rendered":"<p><strong>Description of Wind Tower Welding Line:<\/strong><br \/>\nThis wind tower welding line, also called wind turbine tower production line, is specially designed for the submerged-arc welding of outer circular seam of wind power generator tower pole. It adopts cantilever structure, and can use several single cantilever structures to make up a welding workstation so that it can do multi-pass welding. In this way, its welding efficiency can be greatly increased.<br \/>\nThis wind tower welding line is mainly composed of bending machine (rolling machine), CNC cutting machine, welding equipment, welding rotator set, and sandblasting and painting turning rolls.<\/p>\n<p><strong>Key Points in Wind Tower Production:<\/strong><br \/>\n1. The single-stage wind tower tube is cone-shaped, and the diameters in the upper and lower part are approximate to each other, so users should strictly control the feeding of main steel plate.<br \/>\n2. Welding deformation between the flange and the tower tube should be strictly controlled.<br \/>\n3. Much attention should be attached to the matching and welding of the ring collar of the tube, because each stage of the tower is long. While the right straightness accuracy is assured, the matching efficiency can also be greatly improved.<\/p>\n<p><strong>Single Tower Tube Production Process:<\/strong><\/p>\n<figure id=\"attachment_2155\" aria-describedby=\"caption-attachment-2155\" style=\"width: 600px\" class=\"wp-caption aligncenter\"><img decoding=\"async\" loading=\"lazy\" class=\"wp-image-2155 size-full\" src=\"https:\/\/abkweldmc.com\/wp-content\/uploads\/2023\/07\/wind-tower-welding-line_1.jpg\" alt=\"Single Tower Tube Production Process\" width=\"600\" height=\"175\" srcset=\"https:\/\/abkweldmc.com\/wp-content\/uploads\/2023\/07\/wind-tower-welding-line_1.jpg 600w, https:\/\/abkweldmc.com\/wp-content\/uploads\/2023\/07\/wind-tower-welding-line_1-300x88.jpg 300w\" sizes=\"(max-width: 600px) 100vw, 600px\" \/><figcaption id=\"caption-attachment-2155\" class=\"wp-caption-text\">Single Tower Tube Production Process<\/figcaption><\/figure>\n<p><strong>Multiple Tower Tubes Production Process:<\/strong><\/p>\n<figure id=\"attachment_2157\" aria-describedby=\"caption-attachment-2157\" style=\"width: 600px\" class=\"wp-caption aligncenter\"><img decoding=\"async\" loading=\"lazy\" class=\"wp-image-2157 size-full\" src=\"https:\/\/abkweldmc.com\/wp-content\/uploads\/2023\/07\/wind-tower-welding-line_3.jpg\" alt=\"Multiple Tower Tubes Production Process\" width=\"600\" height=\"177\" srcset=\"https:\/\/abkweldmc.com\/wp-content\/uploads\/2023\/07\/wind-tower-welding-line_3.jpg 600w, https:\/\/abkweldmc.com\/wp-content\/uploads\/2023\/07\/wind-tower-welding-line_3-300x89.jpg 300w\" sizes=\"(max-width: 600px) 100vw, 600px\" \/><figcaption id=\"caption-attachment-2157\" class=\"wp-caption-text\">Multiple Tower Tubes Production Process<\/figcaption><\/figure>\n<p><strong>Tower Tube Sandblasting and Painting Production Process:<\/strong><\/p>\n<figure id=\"attachment_2156\" aria-describedby=\"caption-attachment-2156\" style=\"width: 600px\" class=\"wp-caption aligncenter\"><img decoding=\"async\" loading=\"lazy\" class=\"wp-image-2156 size-full\" src=\"https:\/\/abkweldmc.com\/wp-content\/uploads\/2023\/07\/wind-tower-welding-line_2.jpg\" alt=\"Tower Tube Sandblasting and Painting Production Process\" width=\"600\" height=\"110\" srcset=\"https:\/\/abkweldmc.com\/wp-content\/uploads\/2023\/07\/wind-tower-welding-line_2.jpg 600w, https:\/\/abkweldmc.com\/wp-content\/uploads\/2023\/07\/wind-tower-welding-line_2-300x55.jpg 300w\" sizes=\"(max-width: 600px) 100vw, 600px\" \/><figcaption id=\"caption-attachment-2156\" class=\"wp-caption-text\">Tower Tube Sandblasting and Painting Production Process<\/figcaption><\/figure>\n<p><strong>Main Components of Wind Tower Welding Line:<\/strong><\/p>\n<p>1. CNC Cutting Machine:<\/p>\n<p><img decoding=\"async\" loading=\"lazy\" class=\"wp-image-2144 size-full aligncenter\" src=\"https:\/\/abkweldmc.com\/wp-content\/uploads\/2023\/08\/cnc-flame-cutting-machine_4.jpg\" alt=\"CNC Flame Cutting Machine\" width=\"500\" height=\"400\" srcset=\"https:\/\/abkweldmc.com\/wp-content\/uploads\/2023\/08\/cnc-flame-cutting-machine_4.jpg 500w, https:\/\/abkweldmc.com\/wp-content\/uploads\/2023\/08\/cnc-flame-cutting-machine_4-300x240.jpg 300w\" sizes=\"(max-width: 500px) 100vw, 500px\" \/> <img decoding=\"async\" loading=\"lazy\" class=\"wp-image-2150 size-full aligncenter\" src=\"https:\/\/abkweldmc.com\/wp-content\/uploads\/2023\/08\/cnc-plasma-cutting-machine_3.jpg\" alt=\"CNC Plasma Cutting Machine\" width=\"500\" height=\"400\" srcset=\"https:\/\/abkweldmc.com\/wp-content\/uploads\/2023\/08\/cnc-plasma-cutting-machine_3.jpg 500w, https:\/\/abkweldmc.com\/wp-content\/uploads\/2023\/08\/cnc-plasma-cutting-machine_3-300x240.jpg 300w\" sizes=\"(max-width: 500px) 100vw, 500px\" \/><\/p>\n<p>There are two kinds of CNC cutters for you to choose: CNC flame cutting machine and CNC plasma cutting machine, and both of them can simultaneously cut several plates, so the cutter is highly efficient.<\/p>\n<p>2.\u00a0Bending Machine:<\/p>\n<p><img decoding=\"async\" loading=\"lazy\" class=\"wp-image-2160 size-full aligncenter\" src=\"https:\/\/abkweldmc.com\/wp-content\/uploads\/2023\/07\/veneer-reeling-machine_3.jpg\" alt=\"veneer reeling machine\" width=\"500\" height=\"400\" srcset=\"https:\/\/abkweldmc.com\/wp-content\/uploads\/2023\/07\/veneer-reeling-machine_3.jpg 500w, https:\/\/abkweldmc.com\/wp-content\/uploads\/2023\/07\/veneer-reeling-machine_3-300x240.jpg 300w\" sizes=\"(max-width: 500px) 100vw, 500px\" \/> <img decoding=\"async\" loading=\"lazy\" class=\"wp-image-2158 size-full aligncenter\" src=\"https:\/\/abkweldmc.com\/wp-content\/uploads\/2023\/07\/veneer-reeling-machine_1.jpg\" alt=\"veneer reeling machine\" width=\"500\" height=\"400\" srcset=\"https:\/\/abkweldmc.com\/wp-content\/uploads\/2023\/07\/veneer-reeling-machine_1.jpg 500w, https:\/\/abkweldmc.com\/wp-content\/uploads\/2023\/07\/veneer-reeling-machine_1-300x240.jpg 300w\" sizes=\"(max-width: 500px) 100vw, 500px\" \/><\/p>\n<p>3. Welding Equipment:<\/p>\n<p><img decoding=\"async\" loading=\"lazy\" class=\"wp-image-1443 aligncenter\" src=\"https:\/\/abkweldmc.com\/wp-content\/uploads\/2022\/01\/welding-manipulator-2-300x225.jpg\" alt=\"welding manipulator\" width=\"533\" height=\"400\" srcset=\"https:\/\/abkweldmc.com\/wp-content\/uploads\/2022\/01\/welding-manipulator-2-300x225.jpg 300w, https:\/\/abkweldmc.com\/wp-content\/uploads\/2022\/01\/welding-manipulator-2-1024x768.jpg 1024w, https:\/\/abkweldmc.com\/wp-content\/uploads\/2022\/01\/welding-manipulator-2-768x576.jpg 768w, https:\/\/abkweldmc.com\/wp-content\/uploads\/2022\/01\/welding-manipulator-2-600x450.jpg 600w, https:\/\/abkweldmc.com\/wp-content\/uploads\/2022\/01\/welding-manipulator-2.jpg 1440w\" sizes=\"(max-width: 533px) 100vw, 533px\" \/> <img decoding=\"async\" loading=\"lazy\" class=\"wp-image-1460 aligncenter\" src=\"https:\/\/abkweldmc.com\/wp-content\/uploads\/2023\/07\/Wind-Tower-Welding-Line-3-300x225.jpg\" alt=\"Wind Tower Welding Line-3\" width=\"533\" height=\"400\" srcset=\"https:\/\/abkweldmc.com\/wp-content\/uploads\/2023\/07\/Wind-Tower-Welding-Line-3-300x225.jpg 300w, https:\/\/abkweldmc.com\/wp-content\/uploads\/2023\/07\/Wind-Tower-Welding-Line-3-768x576.jpg 768w, https:\/\/abkweldmc.com\/wp-content\/uploads\/2023\/07\/Wind-Tower-Welding-Line-3-600x450.jpg 600w, https:\/\/abkweldmc.com\/wp-content\/uploads\/2023\/07\/Wind-Tower-Welding-Line-3.jpg 800w\" sizes=\"(max-width: 533px) 100vw, 533px\" \/><\/p>\n<p>The welding equipment mainly consists of welding manipulator, submerged-arc welding system, automatic recycling feeding system, and welding rotator.The matching part and circular seam welding section of the wind tower tube are mainly made up of\u00a0welding manipulator, submerged arc welding system, automatic recycling feeding system, welding rotator.<\/p>\n<p>4. Sandblasting and Painting:<\/p>\n<p>Turning rolls, with walking ability, are fitted to facilitate the sandblasting and painting process of the tower tubes. The painting turning rolls have adopted middle-concave roller wheels, which can be used to support flanges so that painting work can be finished conveniently. The motor is anti-explosive and dust-proof.<\/p>\n<p><img decoding=\"async\" loading=\"lazy\" class=\"wp-image-2164 size-full aligncenter\" src=\"https:\/\/abkweldmc.com\/wp-content\/uploads\/2023\/07\/sand-blasting-machine_4.jpg\" alt=\"sand blasting machine\" width=\"500\" height=\"400\" srcset=\"https:\/\/abkweldmc.com\/wp-content\/uploads\/2023\/07\/sand-blasting-machine_4.jpg 500w, https:\/\/abkweldmc.com\/wp-content\/uploads\/2023\/07\/sand-blasting-machine_4-300x240.jpg 300w\" sizes=\"(max-width: 500px) 100vw, 500px\" \/> <img decoding=\"async\" loading=\"lazy\" class=\"wp-image-2163 size-full aligncenter\" src=\"https:\/\/abkweldmc.com\/wp-content\/uploads\/2023\/07\/sand-blasting-machine_3.jpg\" alt=\"sand blasting machine\" width=\"500\" height=\"400\" srcset=\"https:\/\/abkweldmc.com\/wp-content\/uploads\/2023\/07\/sand-blasting-machine_3.jpg 500w, https:\/\/abkweldmc.com\/wp-content\/uploads\/2023\/07\/sand-blasting-machine_3-300x240.jpg 300w\" sizes=\"(max-width: 500px) 100vw, 500px\" \/><\/p>\n<p>Established in 1999, Wuxi ABK Machinery Co.Ltd is a professional manufacturer of welding positioner in China. Apart from welding positioner, we still have many other high-quality products, such as welding rotator, welding turnable, wind tower production line, H beam welding line, pipe welding equipment, CNC cutting machine, grinding machine, roll forming machine, plate bending machine, etc. With ISO and CE certification, our products are quite popular among clients from Spain, India, Germany, South Africa, Brazil, Chile, Argentina, Russia, Italy, France, Vietnam, and more. If you need welding positioner, please contact us freely.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Description of Wind Tower Welding Line: This wind tower welding line, also called wind turbine tower production line, is specially designed for the submerged-arc welding of outer circular seam of wind power generator tower pole. It adopts cantilever structure, and can use several single cantilever structures to make up a welding workstation so that it&#8230;<\/p>\n","protected":false},"featured_media":1461,"comment_status":"closed","ping_status":"closed","template":"","meta":{"_kad_post_transparent":"default","_kad_post_title":"","_kad_post_layout":"default","_kad_post_sidebar_id":"","_kad_post_content_style":"default","_kad_post_vertical_padding":"default","_kad_post_feature":"","_kad_post_feature_position":"","_kad_post_header":false,"_kad_post_footer":false},"product_cat":[35],"product_tag":[],"translation":{"provider":"WPGlobus","version":"2.12.0","language":"vi","enabled_languages":["en","es","de","fr","ru","ar","pt","it","vi"],"languages":{"en":{"title":true,"content":true,"excerpt":false},"es":{"title":false,"content":false,"excerpt":false},"de":{"title":false,"content":false,"excerpt":false},"fr":{"title":false,"content":false,"excerpt":false},"ru":{"title":false,"content":false,"excerpt":false},"ar":{"title":false,"content":false,"excerpt":false},"pt":{"title":false,"content":false,"excerpt":false},"it":{"title":false,"content":false,"excerpt":false},"vi":{"title":false,"content":false,"excerpt":false}}},"_links":{"self":[{"href":"https:\/\/abkweldmc.com\/vi\/wp-json\/wp\/v2\/product\/639"}],"collection":[{"href":"https:\/\/abkweldmc.com\/vi\/wp-json\/wp\/v2\/product"}],"about":[{"href":"https:\/\/abkweldmc.com\/vi\/wp-json\/wp\/v2\/types\/product"}],"replies":[{"embeddable":true,"href":"https:\/\/abkweldmc.com\/vi\/wp-json\/wp\/v2\/comments?post=639"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/abkweldmc.com\/vi\/wp-json\/wp\/v2\/media\/1461"}],"wp:attachment":[{"href":"https:\/\/abkweldmc.com\/vi\/wp-json\/wp\/v2\/media?parent=639"}],"wp:term":[{"taxonomy":"product_cat","embeddable":true,"href":"https:\/\/abkweldmc.com\/vi\/wp-json\/wp\/v2\/product_cat?post=639"},{"taxonomy":"product_tag","embeddable":true,"href":"https:\/\/abkweldmc.com\/vi\/wp-json\/wp\/v2\/product_tag?post=639"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}